Three Routes Start

Compare · Ontario figures · updated 2 November 2026

Industrial millwright vs Plumber

Same columns, no opinion about which is better for you. On typical Ontario figures, Industrial millwright is ahead by year 10 ($638k against $578k), because it pays more per year once you are working. The gap is before tax, rent and loan interest, which hit both routes.

MeasureIndustrial millwrightPlumber
RouteApprenticeshipApprenticeship
CredentialCertificate of Qualification (433A)Certificate of Qualification (306A)
Years to finish45
First real paychequeMonth oneMonth one
Cost (tuition and fees)$1,500$1,500
Typical debt if you borrow$0$0
Earnings, first years$45,000$39,000
Earnings by year 5$69,000$63,000
Net by year 10 (typical)$638k$578k
Demand in OntarioSteadySteady
Time in a classroom15%15%

Earnings by year, roughly

Before tax. Years in school show as "school". Medians rise from the starting figure to the year-5 figure, then stay flat.

Industrial millwrightPlumber
Y1
$49,400
$43,400
Y2
$54,200
$48,200
Y3
$59,000
$53,000
Y4
$63,800
$57,800
Y5
$68,600
$62,600
Y6
$69,000
$63,000
Y7
$69,000
$63,000
Y8
$69,000
$63,000
Y9
$69,000
$63,000
Y10
$69,000
$63,000

Industrial millwright

A day looks like: Installing, maintaining and repairing industrial machinery. Mechanical problem-solving with heavy equipment.

What stops people: Fewer openings than construction trades; factories and plants hire in small numbers.

Downside: Shift work in manufacturing plants. If the plant closes, you move.

Full picture: Industrial millwright

Plumber

A day looks like: Installing and repairing water, drainage and gas systems in homes and commercial buildings; paid on-the-job hours plus in-school blocks.

What stops people: Sponsoring employer, same as most construction trades.

Downside: Physically hard on knees and back over decades. Emergency and weekend calls are part of the job.

Full picture: Plumber

Quick answers

Which pays more, industrial millwright or plumber?

By year five, Industrial millwright is about $69,000 and Plumber about $63,000 (Ontario medians, before tax). By year ten, counting what each cost, Industrial millwright nets roughly $638k and Plumber roughly $578k.

Which is faster to a real paycheque?

Industrial millwright: month one. Plumber: month one.

What does each cost?

Industrial millwright: $1,500 in tuition and fees, typical debt $0. Plumber: $1,500, typical debt $0.

What is the downside of each?

Industrial millwright: Shift work in manufacturing plants. If the plant closes, you move. Plumber: Physically hard on knees and back over decades. Emergency and weekend calls are part of the job.

Get your own three

Seven questions, two minutes, no sign-up. The same numbers as this page, ranked for your answers.

Start the quiz

Figures are Ontario medians and typical costs from Job Bank, Statistics Canada, Skilled Trades Ontario and institution fee pages; the data page lists every source and date. Switch province on either pathway page for BC, Alberta or Quebec figures.